Price to Compare, licensed EGS supply, and PAPowerSwitch business filters
Retail electric choice here is optional shopping against a published default, not a mandatory REP mandate. If you do nothing, your EDC continues to supply generation at the Price to Compare for your commercial class while it also delivers. A licensed electric generation supplier can replace that generation line; PECO, PPL Electric, Duquesne Light, Met-Ed, Penelec, Penn Power, or West Penn Power still owns the wires.
The Pennsylvania Public Utility Commission licenses suppliers and hosts business shopping at https://www.papowerswitch.com/shop-for-business/. Match the GS, GS-1, or other commercial schedule printed on the bill to the portal row. A residential Price to Compare is the wrong benchmark for a coin laundry.
Philadelphia and Pittsburgh city pages illustrate PECO and Duquesne Light bills locally, but statewide you compare EGS offers to the Price to Compare dated on your quote. Capture that date. The PUC refreshes default prices on a published cycle; an undated screenshot is not a durable benchmark.
After a switch, the EDC still delivers and restores outages. Licensed-supplier names appear on the generation line. Confirm the company against https://www.puc.pa.gov/electricity/electric-companies-suppliers/licensed-suppliers/ before you sign, then keep the EDC outage number on the shop wall.
PAGasSwitch, participating LDCs, and the PGW municipal carve-out
Unlike states with electric-only choice, this market also runs an official gas portal at https://www.pagasswitch.com/. Columbia Gas, PECO Gas, Peoples Gas, UGI Gas, National Fuel Gas, and other participating LDCs let eligible commercial accounts shop marketers for commodity while the LDC still delivers therms.
Philadelphia Gas Works is the exception owners miss. PGW is a municipal system. Marketer access and commercial rules differ from PECO Gas even when the store sits a few blocks from a PECO electric meter. Do not drop a PGW account into a PECO Gas PAGasSwitch filter and assume the same enrollment path.
Dual-fuel renewals often stagger. An EGS electric contract and a gas-marketer contract can expire in different months. Align those dates when you can so you are not shopping Price to Compare in July and gas commodity in November with two different workbooks and two different LOAs.
If the dryer meter is on a thin rural LDC or a municipal system, confirm participation before you promise a landlord a dual-fuel save. Delivery of gas stays with the LDC or municipal utility after any marketer enrollment. Outage and leak response remain utility functions, not marketer functions.
PECO, PPL, Duquesne Light, and FirstEnergy opcos across the PJM map
The electric map is an EDC patchwork inside PJM. PECO covers the southeast including Philadelphia. PPL Electric covers a large eastern and central footprint that includes Harrisburg-area and Lehigh Valley meters. Duquesne Light covers the Pittsburgh core. FirstEnergy operating companies—Met-Ed, Penelec, Penn Power, and West Penn Power—cover other counties under distinct tariffs.
Those FirstEnergy names are not interchangeable portal rows. A Met-Ed Price to Compare is not a Penelec Price to Compare. PAPowerSwitch and supplier desks filter by EDC. Treating 'FirstEnergy' as one commercial class is a multi-location error that shows up when Allentown, Erie, and Reading stores get copied onto one confirmation.
Smaller EDCs such as UGI Electric and Citizens' Electric participate in choice with thinner supplier benches. Rural cooperative-adjacent addresses still need bill-header proof. The PUC site at https://www.puc.pa.gov/ is the regulator home page; it does not replace the EDC name on page one.
ISO context is PJM for these EDCs, which affects how suppliers talk about congestion and capacity—but your shopping benchmark remains the Price to Compare for the printed rate class, not a PJM residual index you saw on a webinar. City pages for Philadelphia and Pittsburgh are starting points, not statewide averages.
Generation versus distribution on PECO, PPL, and Duquesne invoices
Open a current bill and split generation or supply from distribution before you open PAPowerSwitch. Distribution, transmission, and EDC riders are delivery. The Price to Compare block—or the EGS generation line after a switch—is supply. Adding those two and calling the sum 'the supplier rate' hides delivery you cannot shop away.
Commercial class codes such as PECO GS matter. Demand-and-energy splits on GS schedules do not match a residential Price to Compare row. If the portal offer assumes a different class, stop and pull the tariff label from the bill header or the EDC account summary.
Consolidated billing keeps the EDC logo on the envelope while an EGS name appears on the generation line. Dual billing, when it occurs, means two invoices. Either way, Duquesne Light or PPL still delivers. A switch does not move outage restoration to the EGS.
When you audit a year of bills, track Price to Compare snapshot dates in one column and EGS energy in another. Delivery riders can move while supply is fixed, or the reverse. That is why 'we beat last year's total' is not a valid comparison unless class, delivery, and dated default supply are held constant.
Winter therms, humid summers, and GS-class laundry operations
Western stores on Duquesne Light or FirstEnergy opcos see winter gas-dryer and space-heat therms stack on the same LDC bill as heating. Southeastern PECO stores add humid-summer HVAC on the electric meter. Neither pattern is a statewide kWh or therm average; use the store's own interval or monthly history.
Washer motors, lighting, and water heating (electric or gas) set the baseload. Dryers dominate therms where gas is the fuel. A dual-fuel shop that only prices the electric Price to Compare leaves the larger seasonal swing on PAGasSwitch or on PGW unexamined.
Match product structure to how the store actually runs. Night-owl urban rooms care about off-peak shapes; weekday drop-off rooms care about coinciding with EDC peak windows on GS demand components. Do not copy a Philadelphia city-page humidity paragraph onto a Scranton Penelec meter.
Municipal aggregation, where a borough or county defaulted residents or small accounts to a selected supplier, can hide on the generation line. Verify whether the laundry is on aggregation supply, EDC Price to Compare, or a bilateral EGS contract before you quote a 'switch from default.'
Philadelphia PECO, Pittsburgh Duquesne, and Harrisburg PPL portfolio traps
A Pittsburgh Duquesne Light Price to Compare cannot benchmark a PPL Harrisburg or PECO Philadelphia meter. Delivery tariffs and default-supply dates differ. Multi-store operators who paste one EGS confirmation across those cities will misstate both supply and delivery.
Inside Philadelphia, PECO electric choice and PGW gas rules can apply to the same street. A store can shop EGS supply on PAPowerSwitch and still sit outside ordinary PECO Gas marketer rules. Check both meters. The Philadelphia city page flags that split; the statewide rule is to treat PGW as municipal until proven otherwise.
Lehigh Valley, Lancaster, and Reading PPL or Met-Ed accounts look 'eastern' on a map and still need their own class codes. Do not reuse a PECO GS workbook tab. Pull each EDC's Price to Compare date and each LDC's PAGasSwitch participation.
Letters of Authorization should list the EDC or LDC, account number, and commodity. A single LOA that says 'all Pennsylvania stores' is how an Erie Penn Power account gets enrolled on a PECO product. Keep city-page context for Philadelphia and Pittsburgh, then expand with EDC-specific rows.
Dual-fuel owner checklist before you leave Price to Compare
Identify the EDC and the gas LDC on page one. If gas is PGW, stop and read municipal commercial rules before you open PAGasSwitch. If electric is a thin rural EDC, confirm supplier availability rather than assuming a PECO-depth bench.
Capture the Price to Compare date and commercial class. Shop https://www.papowerswitch.com/shop-for-business/ with that class, then shop https://www.pagasswitch.com/ for the dryer meter if the LDC participates. Align electric and gas expiration months when both contracts are in play.
Verify the EGS or marketer on the PUC licensed-supplier list. After enrollment, the EDC or LDC still delivers. Spot-check the first two invoices so generation moved and distribution stayed. File EDC outage and gas-emergency numbers separately from supplier billing lines.
For portfolios, one tab per EDC and per LDC. Never copy a Duquesne Light offer onto PPL or a PECO Gas enrollment onto PGW. Re-check aggregation notices in boroughs that run opt-out programs so you know whether 'default' is still the EDC Price to Compare.
- Match GS or GS-1 on the bill to the PAPowerSwitch business row.
- Write down the Price to Compare date before ranking EGS offers.
- Open PAGasSwitch only after you confirm LDC participation.
- Treat PGW as a municipal exception, not PECO Gas.
- Use separate FirstEnergy opco names: Met-Ed, Penelec, Penn Power, West Penn Power.
- Confirm licensed EGS status on the PUC supplier list.
- Keep EDC restoration and LDC leak response off the supplier call tree.
